Happy (Energy) Independence Day

July 5th, 2010 by Tim Delhey Eian
Passive House in the Woods fireworks

Fireworks seen from the Passive House in the Woods roof top terrace (Photo: Gary Konkol)

Happy (Energy) Independence Day from all of us at the Passive House in the Woods.

Thanks for visiting the Passive House in the Woods

July 5th, 2010 by Tim Delhey Eian

Passive House in the Woods on July 3, 2010

Thanks for joining the tour last Thursday. We enjoyed your questions and interest in this high-performance buildings. We’ll post upcoming events on this blog.

Construction Tour Announcement

June 23rd, 2010 by Tim Delhey Eian

Enjoy the Tour

Due to popular demand we added another opportunity to see this amazing project on Thursday, July 1st at 2 pm.

Please RSVP to Amanda at Morr Construction: amanda@morrconstruction.com

Progress Report

June 15th, 2010 by Tim Delhey Eian
Passive House in the Woods entry facade

Entry facade on June 5

Passive House in the Woods living room with sheet rock

Living room with sheet rock

Passive House in the Woods kitchen and dining area

Kitchen and dining area with sheet rock (and Josh Crenshaw)

Passive House in the Woods master bedroom view

Master Bed Room window and view

The rough-in stage is now nearly complete. Sheet rock is going up all throughout—actual rooms are starting to emerge from the rough look that has become so familiar in recent weeks. With most mechanical systems completed or well under way, the end is now more in sight than ever. The last shop drawings are going through the review process now, allowing for construction of cabinets and exterior structures. The next few weeks are going to reveal the interior design package that Christine Frisk and Erin Heikkinen of InUnison Design have been working on, as well as the lighting scheme that Carol Chaffe of Chaffee Associates designed.

PHitW on Metro Hippie

June 15th, 2010 by Tim Delhey Eian

Metro Hippie Logo

Metro Hippie a.k.a. Josh Foss put up a blog post about his recent visit to the Passive House in the Woods project. You can find it at this link. Thanks Josh.

Article in the Pioneer Press

June 6th, 2010 by Tim Delhey Eian

TwinCitiesDotComPioneerPress

The Pioneer Press published an article about the Passive House in the Woods: “Hudson, Wis. / House’s energy use puts it nearly off the grid”

First Blower Door Test successfully completed

June 6th, 2010 by Tim Delhey Eian
Blower Door Test Result

Blower Door Test Result: 93 CFM at 50 Pascal

Passive House in the Woods Blower Door

Blower door with duct blaster

Passive House in the Woods, Smoke Test

Testing for leaks with smoke

With the help of Gary Nelson of the Energy Conservatory in Minneapolis, we were able to conduct a first series of blower door tests. We pressurized and depressurized the building, and used a smoke generator to identify leaks. This was an amazing process and helped us gain a great deal of understanding for the little details that make a building air-tight. In the end, the building delivered an average of 0.36 ACH50. We are excited to have surpassed the Passive House requirement of 0.6 ACH50 during this preliminary test.

Mechanical Systems

May 28th, 2010 by Tim Delhey Eian

The building is currently in the “rough-in” stage, which means that electrical, plumbing, and mechanical systems are being installed.

Electrical

Passive House in the Woods wiring

Wiring bundles

Passive House in the Woods electrical box

Electrical box

Both line and low voltage wiring are installed by EHS. They take great care in a clean installation that is easy to understand. Low voltage and line voltage lines are run in separate bundles in an effort to keep signals within undisturbed.

The electrical system in a Passive House is similar to ordinary electric systems with the exception that any protrusion through exterior walls or the roof are being sealed for air-tightness and uninterrupted insulation.

Gary chose to have a lighting control system by Lutron installed. This is not required by the Passive House standard but can help reduce lighting-related energy loads.

Plumbing

Passive House in the Woods, air admittance valve

Plumbing with air-admittance valve

Passive House in the Woods insulated water supply lines

Insulated water supply lines

Passive House in the Woods wall-hung toilet rough-in

Wall-hung toilet rough-in

The plumbing system is very simple. The design of the home puts most of it in one single wall that extends vertically from the basement to the second floor throughout the home. This means short waste and supply pipe runs, and an economical installation. The supply lines are copper, and continuously insulated for efficiency. The waste lines are PVC, and mostly insulated. Warm waste water is used to pre-warm the well-water that is being pumped into the hot water tank, upping the efficiency of the hot water system. Additionally, hot water is being pre-heated by a solar thermal collector on the roof. Last but not least, an electric on-demand water heater can boost the water temperature if the combination of waste-water heat recovery and solar thermal pre-heating do not make it hot enough. 85% of the hot water needs will not require the on-demand unit.

The plumbing system in a Passive House is similar to ordinary plumbing systems with the exception that pipe runs are continuously insulated, and that air-admittance valves are being used instead of vent stacks.

Ventilation

Passive House in the Woods ventilation system

Ventilation system (duct and ceiling box)

Passive House in the Woods Passive House certified Luefta ventilation machine

Passive House certified Lüfta ventilation machine

The ventilation system is at the heart of each Passive House. This building will utilize a Passive House certified Lüfta heat recovery ventilator from Germany, supplied by Peak Building Products. It will be combined with a 600 foot PEX earth loop provided by Rehau—buried below frost on the property. This system will pre-warm, or pre-cool and dehumidify the incoming ventilation air and boost the system’s efficiency to well above 90%. The Luefta machine will supply the entire home with outside air year-round, and exhaust air from the bathrooms and kitchen. The ductwork comes from Inno-Products and is comprised of a home-run layout with 3″ diameter plastic flex-ducts. The systems throughput is being adjusted by sensors that measure both CO2 and humidity levels in the air. This setup means that the homeowner does not have to adjust ventilation rates, and that the system will ramp down when it’s not needed to conserve energy.

Backup Heating

Nuheat standard mats, product image

Nuheat standard mats

Nuheat is supplying electric in-floor heating mats on room temperature thermostats. There are 7 zones throughout the home that can be individually adjusted. The entire system is sized to supply a peak heat load of 10 kBtu—about 3,000 Watts, or the equivalent of running 2 hair dryers at the same time. This represents a 90% reduction in heating system over most conventional construction today.

The heating system in a Passive House is very different from ordinary heating systems. It is merely a backup for long stretches of extremely cold and cloudy days in the winter and does not compare to conventional systems in terms of its capacity.

Renewable Systems

Passive House in the Woods PV tracker, underside

PV tracker, underside

Passive House in the Woods stand-offs for solar PV and thermal systems

Stand-offs for solar PV and thermal systems

Energy Concepts helped with the design of the renewable energy systems. There are three systems that will go into the building: A solar photovoltaic tracker, a photovoltaic panel array, and a solar thermal domestic hot water system. The photovoltaic systems are scheduled to produce about 6,750 kWh of electricity annually, while the solar thermal panel has the capability to pre warm enough domestic hot water to provide 85% of the annual demand. The remaining portion of heat needed will be supplied with the help of a Stiebel-Eltron booster heater.

Hawthorne Neighborhood in North Minneapolis taking notice of PHitW

May 28th, 2010 by Tim Delhey Eian

Hawthorne Hawkman posted an article about a visit to the Passive House in the Woods. This design team has been pursuing a Passive House design for the Eco-Village in Hawthorne for over two years and is committed to the idea. Find the post at this link.

Thanks for visiting the Passive House in the Woods today

May 27th, 2010 by Tim Delhey Eian
Passive House in the Woods, Living room corner window

Living room corner window

Thanks for joining the tour today. We had a good time showing the Passive House in the Woods and for the first time, the German Optiwin windows installed in the ICF walls.

Media

Midwest Home Magazine

Platinum Sponsors

TE Studio

Morr Construction

InUnison Design

American Standard

B-Style

Jado

Partners 4 Design

Porcher

Room & Board

Gold Sponsors


Peak Building Products

Crystal Cabinets

Warners’ Stellian

Silver Sponsors


Built Environments

Armacell

DiversiFoam

EHS

Granite Tops

Intersource

Lutron

NuHeat

Üson

Bronze Sponsors


Energy Concepts

American Clay

Hunt’s Carpet Service

Rehau

St. Croix Electric